I am pleased to announce the completion of Cribbage Board #10. It has taken 3.5 years of hard work and dedication.
The first completed Wedding Board was “shipped” on 4/16. The second was “shipped” on 6/12. Documentation was assembled and completed on 6/25 (for a design contest).
Check back soon for more pictures and documents and videos of the completed Wedding Boards.
Thanks to all those that have helped and offered support along the way (especially Steph…for thousands of reasons).
Special thanks to:
- Shannon Gomes (firmware)
- Stan Haladus (CNC metalwork).
Leave a Reply